The annual MEED Arabian World Construction Summit (AWCS) in Dubai today was told that the deadline for the completion of the 124-kilometre Makkah Metro is to be reduced to 10 years rather than by 2029 as originally planned. “The clock…
The annual MEED Arabian World Construction Summit (AWCS) in Dubai today was told that the deadline for the completion of the 124-kilometre Makkah Metro is to be reduced to 10 years rather than by 2029 as originally planned. “The clock…